Date & Time

background

Christmas

Friday, June 17, 2011

Paper Roses

Boy, where has June gone? Here it is half over already. Big brother and D S-I-L visited and left already. I am truly amaze at how fast the time goes by.
I am going into another stage of paper crafts. Above is a link to these very cute paper roses. I'm heading out to build some now.
Hope you enjoy creating these.
I also am working on a new quilt top using a "Charm Pack". I've been very slow to accept these precut packages, but decided I need to look into to them. So I enrolled in Jenny Doan's online quilting school. The very first full lesson I watched I learn a technique that blew my mind.
Yes, after almost 35 years of quilting, my mind can still be blown away! These young ladies are filled with wonderful and amazing techniques. The class is from craftsy.com, and Missouri Quilt Co. so check it out also.
xoxoxo

Thursday, June 2, 2011

Easy Quilt Candy Flowers Table Runner Finished

Well, I made it! The new table runner is finished before big Brother & d S-I-L got here. I'm telling you this gave me a rash of *&#% by the time I finished the buttons this morning. I just don't understand! I have so much "stuff" in my stash except the "stuff" I need or want for any give project. Then I have to go to the store to buy more.
I started this on Tuesday and figured one afternoon and one evening TOPS! Sure, if you are superwoman! Which I am not these days!
First, I don't have the right color fabric, oh well, I can do that; then not enough of any one fabric; I can do that! Then, oh yes, sure I have buttons. I have all kinds of buttons. Where are they? Who the heck knows! Oh lets go to the fabric store, grocery store and maybe even breakfast, first.
That sounds like a fantastic idea.
Meet old friends at the restaurant, extra time spent.
Fabric store, oh they are having a sale on batting, spend another $100.00.
Grocery store, stocking up can goods, paper products at Sam's Club. Well, there went any extra money we thought we had.
Now, we are hot and tired. Guess what? The cashier at Joann's forgets to put the "buttons" in the bag and we get all the way home and no buttons, the reason for the whole trip in the first place.
I thought I banished "Murphy's Law" years ago!
Wrong on another one!
DH drives all the way back across town only to be told that "I" his wife should have checked to make sure "she" had everything. Sh__! isn't that HER job! Doesn't she get paid to check us out? Cash and bag? Heck yes, but then there are no competent workers looking for jobs. Perhaps it is the low paying wage that makes these people so incompetent.
Anyway, this whole project was a nightmare and it fought me all the way, but here it is.
But it is finished now and I'm happy with it. Looks very nice. Now, if Brother and Sister-in-law would get here today soon, I'd be really ready for dinner at "The Red Lobster"

Monday, May 30, 2011

Quick Project

Started a quick table runner project this afternoon and I'm about half way finished with the appliqué. This is looking pretty good considering I doing it by machine. I usually always do appliqué by hand.Pictures will not be posted until tomorrow. It is time to give it a rest. Big Brother and D S-I-L will be here on Thursday and I still have tons of things to do before they arrive.

Saturday, May 28, 2011

Finally Done!

Ok, Tootie-Fruiti is done! Put the last stitch in her this afternoon with the label. Dear Brother & Sister-In-Law will be here next weekend, so I'm hoping they will be pleased with their 50th Anniversary gift.
Now, without further ado, HERE'S TOOTIE:

Saturday, May 21, 2011

Another Dear Jane Block Finished

Finished another Dear Jane block for QCA group. I really like the colors in this one. Now, I'm off to the sewing room to press a bolt of muslin and to measure the Tootie Fruity quilt. I really want it done to give to my brother and sister-in-law when they get here next month.
They will be married 50 years on June 2, 2012, so I really want to give it to them for an anniversary present.
Oh BTW: here is the  Dear Jane Block:

Digital Scrapbooking

Today was the first day since April, 2010 that I did any digital scrapping. I've been so busy with my quilting that I just didn't have time and besides, I lost tons of digital pictures during an external hard drive crash... Yes, they do crash! And then I lost the flash drive that I used as a backup! Then I was sick, but now am getting better, so I'm going to be doing more.
I own StampinUp's "My Digital Studio" and have lots of downloads. Oh by the way, YOU can purchase "My Digital Studio" at my StampinUp website here: http://maxine.creates.stampinup.net/
Anyway, here is what I did today.
This is Emma. Emma is my granddaughter's and her Mom's newest pet. Emma is now a certified "Therapy Dog" Way to go Emma!

Friday, May 20, 2011

Quilter's Pledge

Quilter’s Pledge

I will never feel guilty about the size of my stash
I will treat my machine and rotary cutter with respect
I will not fear color, stripes, plaids or dots
I will encourage and share knowledge with fellow quilters
I will feel free to sew in my underwear and barefoot
I will feel free to collect sewing machines without guilt
I will visit quilt shops, even during family vacations
I will use my iron for fabric rather than clothing
I will hide my scissors from spouse and children
I will not feel guilt over fondling my fabric
"Copyright 2009 by Tiger Lily Quilt Co / Donna M. Papaleo "
http://www.tigerlilyquiltco.com/quilterspledge.cfm

I started a new quilt on Sunday. It is comprised of 1200 + pieces. So here is day 2, day 3 and day 5 of my "Starry Log Cabin" quilt. And another Dear Jane block done.
Actually, the quilting has been going pretty slowly this week. Seems like I'm getting interrupted more often then usual. DH isn't home today, got to a car swap with one of his buddies, so I figured I would get lots done, but here I sit at the computer.
Ordered a quick zipper system for my Tin Lizzie, but it hasn't shipped yet so don't know when I will get it, probably next week sometime. Does it always seem that when you want something really in a hurry that it takes the longest for it to get here. Anyway, it should work really neat for me instead of having to do all that pinning when one pinning will do!  I so want to get at that machine, but at this rate, I'm not going to have MQ4 (Tutti Fruiti) done by the time big brother gets here next month.

Day 2 - 3 - Chain piecing:



Day 5 - 4 block complete, 76 to go!




Saturday, May 14, 2011

Pillow Shams for F & P Civil War Sampler

Ok, another Saturday night! Isn't there a song like that? Anyway, it isn't night yet, but I'm up and at 'em! Finish the last pillow sham for the Fons & Porter's Civil War Sampler by Toby Lischko. DH loves them and has already confiscated one of them. Also ordered a Zipper Leader system this morning, not as expensive as I thought they would be. In the meantime, I'm ready to fire up Lizzie and get the Civil War Sampler quilted and be ready to do my MQ4 on the frame when the new leader systems arrives.
We are still struggling with cold and allergies don't seem to help them any. We were on antibotics and cough syrup last week but have had little change except that the fever and flu symptons seem to have gone away. I started back on the allergy medicine in hopes it will help some.
Best wishes and prayers go out to my good, loving friend Bonnie who had a quadtruple bypass surgery last Monday. OMG, what a shock!
Ok, now here is the Sham!
They are very large and the directions stated to put the opening lengthwise, but now I wish I had did it the shorter side because they are gapping all over the place. We will need some new pillows now! Extra Large!
wahoo!
Happy Saturday!

Saturday, May 7, 2011

OMG, Saturday almost gone already. I have a bad cold and flu but I am still quilting today. I finished another block from QCA, the applique group. Baltimore's Country Cousins - This block is Garden Medallion:

Friday, May 6, 2011

Civil War Sampler Quilt

I got the top together this morning and got the borders on it. I was really disappointed that I could get the blocks sized properly, but then I am usually in a hurry anyway, so it will keep someone warm even if the points are not all there! I had fun making this top and now I'm ready to get into the sewing room and work on Tin Lizzie 18 and get these tops quilted. There are now 4 to do before the 4th of July. That is my goal and I'm sticking to it for sure!
Take a look at Fons and Porter's Civil War Sampler designed by Toby Lischko.